-
2008-03-07 23:14:50
/ Oracle入门与认证
请教一个043的问题,下面问题的答案是什么?Using Oracle Scheduler you have scheduled two jobs, JOB_A and JOB_B, to run at 9:00 p.m.every Friday.You want both the jobs to use a single resource plan, WEEKEND_PLAN.Which task must have already been performed to enable you to achieve this objective?A. A window must have been created with the WEEKEND_PLAN resource plan.B. A program must have been created with the WEEKEND_PLAN resource plan.C. A job class must have been created with the
查看(627)
评论(10)
-
2008-02-22 19:43:35
/ Oracle入门与认证
元宵节我也过了042,100%通过。谢谢帮助过我的所有人!
查看(449)
评论(4)
-
2008-02-12 10:08:25
/ Oracle入门与认证
what is the implication of setting the initialization parameter FAST_START_MTTR_TARGET to 0 in your database?A. MTTR Advisor would be disabledB.Red Log Advisor would be disabledC.Automatic tuning of checkpoint would be disabledD.Checkpoint information would not be written to the alert log file有的TK上说这道题的答案是C,有的TK上说这道题的答案是A不知道答案究竟是什么?
查看(491)
评论(3)